Weekly Summary 08/06/09 – 14/06/09
Phase: Engineering
Version: None
Weekly Summary of Activities:
The aim of this week was to begin the engineering of the environment's main window, and, specifically the modules within it. Activities comprised of placement and design of the module's visual features as well as preliminary engineering of different basic functions and parameters (loading the playlist within the module, hide/show parameters pertaining to each timesclae, load settings, etc.). This task was sufficiently complete, however may still require some attention during this week.
This Week’s Objectives:
The subsequent section outlines the objectives of this week.
- Fix bug with playlist loading function
- General housekeeping to free up the main window's landscape
- Continuation of the engineering of the main window's modules. Including:
- a sub patch for handling six separate audio buffers
- initial engineering of three (as it pertains to the audio's timescale within the soundscape) sub patches capable of handling the audio